First Presbyterian Church of Salinas Interior

First Presbyterian Church of Salinas

The growing congregation of this church required a larger, state of the art facility, delivered as economically as possible. Bogard Construction met the value engineering challenge by providing structural systems cost analysis up front, as well as by including design-build mechanical, electrical, plumbing and sprinkler scopes in the contract. One major design criteria was for an open Sanctuary, without columns interrupting line of site to the stage. This was accomplished by utilizing open web steel trusses spanning the 113 foot wide space. The combined Sanctuary and Balcony areas seat approximately 1,400 people.

View Full Project