During the design phase
of this large steel framed structure, it was
discovered that the foundation would rest on a former riverbed. Bogard
Construction
met this challenge by installing a 35 inch
thick floating slab capable of withstanding significant soil loss in
the
event of an earthquake similar to the one experienced
in 1989. Bogard Construction's work often begins before groundbreaking
during the design and cost analysis phase,
resulting in cost-effective
suggestions and timely completions for even
the most challenging projects.